Identified Sites List Information

Project Code: C503170020Site Status:Active
Site Name: ONEOK FMGP - JUNCTION CITY
CERCLIS Number: KSD984789525
Other Names: FMGP - JUNCTION CITY
Address: 325 SE 4TH STREETCity:JUNCTION CITY
Zip Code: 66441
County: GERiver Basin: Smoky Hills - Saline
Latitude: 39.02577Longitude:-96.82601
Program Name: BER - State CooperativeProject Manager:Alexia Bennett
Contaminants: Crude Oil, Heavy Metal, Refined Petroleum, SVOC, VOC

Environmental Use Control In Place ?   No
We are currently experiencing technical difficulties with requests for some documents. If an attempt to download an individual document from the “Documents/Photos Available” link does not return the expected results, please contact the Project Manager associated with the Identified Site or the Remedial Section at 785-296-1660. We are working to resolve this problem as quickly as possible and apologize for any inconvenience this may cause.
Documents/Photos Available
(Opens in New Window)
 

Site Narrative:
The Junction City FMGP site is managed by ONEOK (now known as ONE-Gas, Inc.). The original Consent Order (Case No. 94-E-0172) was signed October 7, 1994. An amendment to the Consent Order, signed by the secretary May 5, 2003, grouped eight FMGP sites and allows ONE-Gas to expedite investigation and if need be, clean up the site. ONEOK implemented Interim Remedial Measures investigations in August 2008.

The Investigation and interim response were complicated by the following: 1) the site is currently a repair and storage facility for school bus operations and is active for 9 months of the year; 2) there is a desire of the "bus barn" owner that activities have as little impact during the academic year as is reasonable; and, 3) there are former and existing adjacent underground storage tanks in the direct vicinity of the site. It is unclear whether residual contamination associated with these tanks have impacted the FMGP site. ONE-Gas completed the field work for the Interim Removal Action at the FMGP site in August 2008. ONE-Gas developed a prioritization scheme/programmatic schedule for added characterization tasks at this and other FMGP sites and presented this approach to KDHE at a meeting held on March 2016. The initial phase of the Supplemental Site Investigation (SSI) was completed late summer 2019. the Draft SI report was conditionally approved. An initial phase of added characterization was completed in late 2019. The final phases of investigation leading to the development of a Corrective Action strategy is on-going consistent with the annual 36-month (rolling) calendar/schedule provided by ONEGas
 

Legal Description
 

Actions Completed
Activity TypeActivityStartCompleted
INTERIM ACTION Interim Remedial Measure - source02/09/200902/09/2009
INVESTIGATION Phased Investigation07/15/201907/15/2019
 

Actions Underway
Activity TypeActivityStartCompleted
MONITORING Monitoring  
MASTER PROJECTMaster Project Details02/09/2009 
EVALUATION OF REMEDIAL ALTERNATIVES Corrective Action Study05/16/2012 
INVESTIGATION Phased Investigation04/07/2021 
 

Actions Proposed
Activity TypeActivityStartCompleted
No Actions Proposed Information Found
 