BER is transitioning to a new database management system. Data displaying from the ISL was last updated as of 8 am CST on June 3, 2021. Should you have any immediate data needs, please submit a Kansas Open Records Act (KORA) request. We apologize for the inconvenience.
Kansas Department of Health and Environment
Bureau of Environmental Remediation
Identified Sites List Information
| Project Code: | C208772484 | Site Status: | Active |
| Site Name: | VIM TRAILER (NIC) |
| CERCLIS Number: | |
| Other Names: | |
| Address: | 2811 N OHIO ST | City: | WICHITA |
| Zip Code: | 672194318 |
| County: | SG | River Basin: | Lower Arkansas |
| Latitude: | 37.73364 | Longitude: | -97.32477 |
| Program Name: | BER - State Cooperative | Project Manager: | Injal Bhattarai |
| Contaminants: | Refined Petroleum, VOC |
Environmental Use Control In Place ?
No
|
We are currently experiencing technical difficulties with requests for some documents. If an attempt to download an individual document from the “Documents/Photos Available” link does not return the expected results, please contact the Project Manager associated with the Identified Site or the Remedial Section at 785-296-1660. We are working to resolve this problem as quickly as possible and apologize for any inconvenience this may cause.
Documents/Photos Available
(Opens in New Window) |
|
|
Site Narrative:
The VIM Trailer Site is located within the North Industrial Corridor Site in Wichita, Kansas. The facility was used to manufacture and refurbish tanker trailers. Spent solvent was stored in a 12,000-gallon underground storage tank on the western side of the property. A hole was observed in the tank during its removal in 1993. Contaminants of concern include tetrachloroethene and its degradation products trichloroethene, cis-1,2-dichloroethene, and vinyl chloride, other solvents, as well as petroleum hydrocarbon-related chemicals.
In 2008, KDHE requested that the City of Wichita conduct a Comprehensive Investigation (CI) and prepare a Corrective Action Study (CAS) for the VIM Trailer Site. The initial phase of the CI was completed in September 2009, the second phase of the CI was conducted in early 2010, and the CI Report was approved by KDHE in September 2010.
KDHE reviewed the CAS and requested that the City conduct a pilot test of air sparging/soil vapor extraction (AS/SVE) pilot test before approval. The AS/SVE pilot test was initiated in fall 2020, and quarterly sampling was conducted for 2 years to evaluate effectiveness. An updated CAS was submitted in spring 2023 and is under KDHE review. |
|
|
Legal Description
|
|
|
Actions Completed
| PUBLIC RELATIONS | Public Information Plan | 12/29/2009 | 12/29/2009 |
| INVESTIGATION | Comprehensive Investigation | 09/14/2009 | 09/30/2010 |
| INTERIM ACTION | Interim Remedial Measure - source | 09/01/2019 | 10/01/2022 |
| EVALUATION OF REMEDIAL ALTERNATIVES | Corrective Action Study | 09/30/2010 | 11/28/2023 |
|
|
|
Actions Underway
| MASTER PROJECT | Master Project Details | 09/14/2009 | |
| DECISION OF REMEDIAL ALTERNATIVES | Agency Decision Statement | 11/28/2023 | |
| INTERIM ACTION | Interim Remedial Measure - source | 08/16/2024 | |
|
|
|
Actions Proposed
| PUBLIC RELATIONS | Public Notice | | |
| PUBLIC RELATIONS | Comment Period | | |
|
|
|
Map of Identified Site ((One-mile radius circle around selected site))
Click here for interactive map
 |