Project Code: C208772484Site Status:Active
Site Name: VIM TRAILER (NIC)
CERCLIS Number:
Other Names:
Address: 2811 N OHIO STCity:WICHITA
Zip Code: 672194318
County: SGRiver Basin: Lower Arkansas
Latitude: 37.73364Longitude:-97.32477
Program Name: BER - State CooperativeProject Manager:Injal Bhattarai
Contaminants: Refined Petroleum, VOC

Environmental Use Control In Place ?   No
We are currently experiencing technical difficulties with requests for some documents. If an attempt to download an individual document from the “Documents/Photos Available” link does not return the expected results, please contact the Project Manager associated with the Identified Site or the Remedial Section at 785-296-1660. We are working to resolve this problem as quickly as possible and apologize for any inconvenience this may cause.
Documents/Photos Available
(Opens in New Window)
 

Site Narrative:
The VIM Trailer Site is located within the North Industrial Corridor Site in Wichita, Kansas. The facility was used to manufacture and refurbish tanker trailers. Spent solvent was stored in a 12,000-gallon underground storage tank on the western side of the property. A hole was observed in the tank during its removal in 1993. Contaminants of concern include tetrachloroethene and its degradation products trichloroethene, cis-1,2-dichloroethene, and vinyl chloride, other solvents, as well as petroleum hydrocarbon-related chemicals.

In 2008, KDHE requested that the City of Wichita conduct a Comprehensive Investigation (CI) and prepare a Corrective Action Study (CAS) for the VIM Trailer Site. The initial phase of the CI was completed in September 2009, the second phase of the CI was conducted in early 2010, and the CI Report was approved by KDHE in September 2010.

KDHE reviewed the CAS and requested that the City conduct a pilot test of air sparging/soil vapor extraction (AS/SVE) pilot test before approval. The AS/SVE pilot test was initiated in fall 2020, and quarterly sampling was conducted for 2 years to evaluate effectiveness. An updated CAS was submitted in spring 2023 and is under KDHE review.
 

Legal Description
 

Actions Completed
Activity TypeActivityStartCompleted
PUBLIC RELATIONS Public Information Plan12/29/200912/29/2009
INVESTIGATION Comprehensive Investigation09/14/200909/30/2010
INTERIM ACTION Interim Remedial Measure - source09/01/201910/01/2022
EVALUATION OF REMEDIAL ALTERNATIVES Corrective Action Study09/30/201011/28/2023
 

Actions Underway
Activity TypeActivityStartCompleted
MASTER PROJECTMaster Project Details09/14/2009 
DECISION OF REMEDIAL ALTERNATIVES Agency Decision Statement11/28/2023 
INTERIM ACTION Interim Remedial Measure - source08/16/2024 
 

Actions Proposed
Activity TypeActivityStartCompleted
PUBLIC RELATIONS Public Notice  
PUBLIC RELATIONS Comment Period  
 

Map of Identified Site