Project Code: C208700678Site Status:Active
Site Name: COLEMAN NORTHEAST (NIC)
CERCLIS Number:
Other Names:
Address: 3600 N HydraulicCity:Wichita
Zip Code: 67219
County: SGRiver Basin: Lower Arkansas
Latitude: 37.74965Longitude:-97.31428
Program Name: BER - State CooperativeProject Manager:Injal Bhattarai
Contaminants: VOC

Environmental Use Control In Place ?   Yes

View EUC/IC Information
To view EUC documents, click the link above.

We are currently experiencing technical difficulties with requests for some documents. If an attempt to download an individual document from the “Documents/Photos Available” link does not return the expected results, please contact the Project Manager associated with the Identified Site or the Remedial Section at 785-296-1660. We are working to resolve this problem as quickly as possible and apologize for any inconvenience this may cause.
Documents/Photos Available
(Opens in New Window)
 

Site Narrative:
The Coleman Northeast Site is located within the North Industrial Corridor Site in Wichita, Kansas. In 1990, The Coleman Company (Coleman) conducted a Preliminary Study to assess potential soil and groundwater contamination and conducted a Phase I subsurface investigation in 1991. The results of these studies indicated that soil and groundwater were impacted by chlorinated volatile organic compounds (VOCs). Coleman consequently entered into a Consent Order with KDHE in November 1992 to conduct a site investigation and evaluation of remedial alternatives. Investigations were conducted from 1990 through 1997 and identified elevated concentrations of VOCs emanating from two source areas.

A groundwater extraction system was installed as an interim measure in 1995. The system was installed for hydraulic containment and remediation of impacted groundwater and consists of three groundwater recovery wells located in the southwest part of the facility. A proposal for upgrading the existing groundwater remediation system was approved by KDHE BER in November 2014, and system upgrades were completed in 2015.

A pilot test for soil shredding/remediation was conducted in early 2002. In 2003, the soil source area located southeast of the plant building was remediated using the soil shredding technique. Approximately 5,725 cubic yards of impacted soils were excavated, treated on-site, and used to backfill the excavation. Soil was excavated to a depth of 15-16 feet. Since this time, Coleman has initiated several pilot tests to evaluate treatment technologies for soil and groundwater contamination in the source areas.

Semiannual groundwater and remedial system performance monitoring is ongoing. An enhanced reductive dechlorination (ERD) pilot test was completed in May 2014, and an ERD summary report was approved by KDHE. A Corrective Action Study was approved in August 2016.

KDHE developed the Final Corrective Action Decision, which was available for public comment August 22 thru Sept. 21, 2018, and signed by the KDHE Secretary on October 8, 2018. A new Consent Order was negotiated and the Corrective Action Plan, approved in April 2020, has been implemented. Groundwater monitoring is conducted semi-annually.
 

Legal Description
TownshipRangeSectionDescription
26S01E34NE of the NE
 

Actions Completed
Activity TypeActivityStartCompleted
INTERIM ACTION Interim Remedial Measure - downgradient08/01/1994 
PUBLIC RELATIONS Public Information Plan11/17/199211/17/1992
INVESTIGATION Phased Investigation04/01/199112/18/1998
INTERIM ACTION Interim Remedial Measure - source08/19/200209/22/2004
INTERIM ACTION Interim Remedial Measure - source11/24/200408/26/2005
INTERIM ACTION Interim Remedial Measure - source03/05/200701/26/2009
EVALUATION OF REMEDIAL ALTERNATIVES Feasibility Study07/15/201508/10/2016
PUBLIC RELATIONS Public Notice07/02/201808/22/2018
PUBLIC RELATIONS Comment Period07/02/201809/21/2018
INTERIM ACTION Interim Remedial Measure - source07/24/200910/08/2018
DECISION OF REMEDIAL ALTERNATIVES Corrective Action Decision08/15/201610/08/2018
REMEDIAL DESIGN/ACTION Corrective Action Plan02/19/202004/23/2020
 

Actions Underway
Activity TypeActivityStartCompleted
MASTER PROJECTMaster Project Details04/01/1991 
REMEDIAL DESIGN/ACTION Corrective Action04/23/2020 
MONITORING O&M/Performance Monitoring02/19/2021 
 

Actions Proposed
Activity TypeActivityStartCompleted
No Actions Proposed Information Found
 