BER is transitioning to a new database management system. Data displaying from the ISL was last updated as of 8 am CST on June 3, 2021. Should you have any immediate data needs, please submit a Kansas Open Records Act (KORA) request. We apologize for the inconvenience.

Kansas Department of Health and Environment
Bureau of Environmental Remediation
Identified Sites List Information

Project Code: C201870044Site Status:Active
Site Name: FMGP - ARKANSAS CITY
CERCLIS Number:
Other Names:
Address: 803 S First StreetCity:ARKANSAS CITY
Zip Code: 67005
County: CLRiver Basin: Walnut
Latitude: 37.05485Longitude:-97.04032
Program Name: BER - State CooperativeProject Manager:Alexia Bennett
Contaminants: Heavy Metal, PCB, Refined Petroleum, SVOC, VOC

Environmental Use Control In Place ?   No
We are currently experiencing technical difficulties with requests for some documents. If an attempt to download an individual document from the “Documents/Photos Available” link does not return the expected results, please contact the Project Manager associated with the Identified Site or the Remedial Section at 785-296-1660. We are working to resolve this problem as quickly as possible and apologize for any inconvenience this may cause.
Documents/Photos Available
(Opens in New Window)
 

Site Narrative:
The Arkansas City Former Manufactured Gas Plant (FMGP) site is no longer an active facility. The site is currently managed by WESTAR Energy, Inc. The site, approximately 1.43 acres, is located in the northeast corner of Section 36, township 34 south, Range 3 east.

The Arkansas City Gas and Electric company operated at the property for fifteen years (1890 to 1904). According to available file information, The southern portion of the former facility is now owned by ACW Iron and Metal. The northern portion is owned by Unified School District 470 and is used primarily for storage and minor maintenance. None of the former structures are apparent today. A Consent Order was signed by KDHE, 7 October 1994 and amended to include the Arkansas City FMGP site in 13 January 2003. Initial field investigation activities were conducted July 8, 2003. The Remedial Investigation Report was submitted in October 2003 and subsequently amended in October 2004.

Investigation documents conclude that former manufactured gas plant waste were identified in groundwater (MW-2) and sub-surface soil on site and recommended a limited, interim [soil] removal measure (IRM) or action, removing impacted materials in and around soil probes SP 6, 7, 20 and 22.

After complying with public participation requirements, the interim removal action was conducted August 2005. Confirmation sampling showed that the extent of soil impacts was slightly greater than anticipated and thus added soil was removed (after a second mobilization). A preliminary corrective action summary report was submitted and approved. WESTAR Energy submitted a Draft Corrective Action Study (CAS) which KDHE reviewed providing comments to Westar. A revised CAS was received by KDHE on August 30, 2013. KDHE completed review noting some minor but lingering concerns with some CAS verbiage. This verbiage was corrected and KDHE approved the Corrective Action Study November 21, 2013. The Agency Decision Statement public comment period is complete; KDHE received no comments.

The Corrective Action Plan - CAP - was approved January 26, 2016. Implementation of the selected remedy is on going. The responsible party is pursuing approval of Environmental Use Controls for this Site, including the adjacent land owner agreement to have an EUC on a small portion of his property. Therefore, EUCs are in process.
 

Legal Description
 

Actions Completed
Activity TypeActivityStartCompleted
ASSESSMENTPreliminary Assessment (PA)06/30/199306/30/1993
INVESTIGATION Remedial Investigation10/30/200310/30/2003
INVESTIGATION Remedial Investigation10/07/200410/07/2004
INTERIM ACTION Interim Remedial Measure - source08/08/200508/22/2005
EVALUATION OF REMEDIAL ALTERNATIVES Corrective Action Study11/21/201311/21/2013
PUBLIC RELATIONS Public Notice10/29/201407/13/2015
PUBLIC RELATIONS Comment Period07/13/201507/29/2015
DECISION OF REMEDIAL ALTERNATIVES Agency Decision Statement10/29/201409/08/2015
REMEDIAL DESIGN/ACTION Corrective Action Plan12/29/201501/26/2016
 

Actions Underway
Activity TypeActivityStartCompleted
MASTER PROJECTMaster Project Details06/30/1993 
MONITORING Monitoring12/10/1997 
 

Actions Proposed
Activity TypeActivityStartCompleted
No Actions Proposed Information Found
 

Map of Identified Site
((One-mile radius circle around selected site))

Click here for interactive map


ISL Classes