BER is transitioning to a new database management system. Data displaying from the ISL was last updated as of 8 am CST on June 3, 2021. Should you have any immediate data needs, please submit a Kansas Open Records Act (KORA) request. We apologize for the inconvenience.
Kansas Department of Health and Environment
Bureau of Environmental Remediation
Identified Sites List Information
Project Code: | C508570370 | Site Status: | Active |
Site Name: | Fast One Hour Cleaners |
CERCLIS Number: | |
Other Names: | |
Address: | 1208 S SANTA FE | City: | SALINA |
Zip Code: | 67401 |
County: | SA | River Basin: | Smoky Hills - Saline |
Latitude: | 38.81772 | Longitude: | -97.6095 |
Program Name: | BER - Dry Cleaner Remediation | Project Manager: | Michael Casanova |
Contaminants: | VOC |
Environmental Use Control In Place ?
No
|
We are currently experiencing technical difficulties with requests for some documents. If an attempt to download an individual document from the “Documents/Photos Available” link does not return the expected results, please contact the Project Manager associated with the Identified Site or the Remedial Section at 785-296-1660. We are working to resolve this problem as quickly as possible and apologize for any inconvenience this may cause.
Documents/Photos Available
(Opens in New Window) |
|
Site Narrative:
PCE had been detected in Salina PWS wells #1, #4, and #5. An ESA Report was completed on August 10, 1998. As part of the ESA, 34 push probes were advanced to collect soil and groundwater samples. Private wells were sampled with one well having PCE above MCL. PCE was detected in soils above the soil-to-groundwater pathway as well as in the soil vapor. PCE was also detected in groundwater above MCL down gradient of the drycleaner. Due to the soil contamination, an SVE remediation system was installed and started April 6, 1998 then shut down in October 2001. Long term monitoring has continued since 2001. |
|
Legal Description
14 | 03W | 24 | | SW of the NW of the SE of the SE |
|
|
Actions Completed
MONITORING | Long Term Monitoring | 09/17/2021 | |
MONITORING | Long Term Monitoring | 09/22/2022 | |
REMEDIAL DESIGN/ACTION | Corrective Action Plan | 01/10/1998 | 01/10/1998 |
ASSESSMENT | Expanded Site Assessment | 08/10/1998 | 08/10/1998 |
REMEDIAL DESIGN/ACTION | Corrective Action Report | 05/21/1999 | 05/21/1999 |
MONITORING | O&M/Performance Monitoring | 07/13/2001 | 07/13/2001 |
REMEDIAL DESIGN/ACTION | Corrective Action | 10/05/2000 | 10/01/2001 |
MONITORING | Long Term Monitoring | 08/24/2016 | 08/24/2016 |
MONITORING | Long Term Monitoring | 02/14/2018 | 02/15/2018 |
MONITORING | Long Term Monitoring | 04/24/2019 | 06/18/2019 |
MONITORING | Long Term Monitoring | 07/13/2001 | 02/18/2021 |
|
|
Actions Underway
MASTER PROJECT | Master Project Details | 01/10/1998 | |
MONITORING | Long Term Monitoring | 07/24/2024 | |
|
|
Actions Proposed
No Actions Proposed Information Found
|
|
|
Map of Identified Site ((One-mile radius circle around selected site))
Click here for interactive map
 |