Kansas Department of Health and Environment
Bureau of Environmental Remediation
Identified Sites List Information

Project Code: C508570370Site Status:Active
Site Name: Fast One Hour Cleaners
CERCLIS Number:
Other Names:
Address: 1208 S SANTA FECity:SALINA
Zip Code: 67401
County: SARiver Basin: Smoky Hills - Saline
Latitude: 38.81772Longitude:-97.6095
Program Name: BER - Dry Cleaner RemediationProject Manager:Michael Casanova
Contaminants: VOC

Environmental Use Control In Place ?   No
We are currently experiencing technical difficulties with requests for some documents. If an attempt to download an individual document from the “Documents/Photos Available” link does not return the expected results, please contact the Project Manager associated with the Identified Site or the Remedial Section at 785-296-1660. We are working to resolve this problem as quickly as possible and apologize for any inconvenience this may cause.
Documents/Photos Available
(Opens in New Window)
 

Site Narrative:
PCE had been detected in Salina PWS wells #1, #4, and #5. An ESA Report was completed on August 10, 1998. As part of the ESA, 34 push probes were advanced to collect soil and groundwater samples. Private wells were sampled with one well having PCE above MCL. PCE was detected in soils above the soil-to-groundwater pathway as well as in the soil vapor. PCE was also detected in groundwater above MCL down gradient of the drycleaner. Due to the soil contamination, an SVE remediation system was installed and started April 6, 1998 then shut down in October 2001. Long term monitoring has continued since 2001.
 

Legal Description
TownshipRangeSectionParcelDescription
1403W24 SW of the NW of the SE of the SE
 

Actions Completed
Activity TypeActivityStartCompleted
MONITORING Long Term Monitoring09/17/2021 
MONITORING Long Term Monitoring09/22/2022 
REMEDIAL DESIGN/ACTION Corrective Action Plan01/10/199801/10/1998
ASSESSMENTExpanded Site Assessment08/10/199808/10/1998
REMEDIAL DESIGN/ACTION Corrective Action Report05/21/199905/21/1999
MONITORING O&M/Performance Monitoring07/13/200107/13/2001
REMEDIAL DESIGN/ACTION Corrective Action10/05/200010/01/2001
MONITORING Long Term Monitoring08/24/201608/24/2016
MONITORING Long Term Monitoring02/14/201802/15/2018
MONITORING Long Term Monitoring04/24/201906/18/2019
MONITORING Long Term Monitoring07/13/200102/18/2021
 

Actions Underway
Activity TypeActivityStartCompleted
MASTER PROJECTMaster Project Details01/10/1998 
MONITORING Long Term Monitoring07/24/2024 
 

Actions Proposed
Activity TypeActivityStartCompleted
No Actions Proposed Information Found
 

Map of Identified Site
((One-mile radius circle around selected site))

Click here for interactive map


ISL Classes