BER is transitioning to a new database management system. Data displaying from the ISL was last updated as of 8 am CST on June 3, 2021. Should you have any immediate data needs, please submit a Kansas Open Records Act (KORA) request. We apologize for the inconvenience.

Identified Site Listing Details

Site Name: SUNFLOWER AAP SWMU 10 F-LINE PROCESS FACILITIES
Project Code: C4-046-71013


Document TypeDocument DateDocument DescriptionPreview/Download Document
BER REPORTS AND PLANS01/26/2016Corrective Measures Completion Final Preview/Download
BER REPORTS AND PLANS06/04/2007Demo PS MEC Foundation & Soil Rmvl -ADD Preview/Download
BER REPORTS AND PLANS05/18/2007Summary of Pesticide Contamination Rem Preview/Download
BER REPORTS AND PLANS04/18/2007Pilot Study Pesticide Sampling Preview/Download
BER REPORTS AND PLANS01/01/2007Pesticide Soil Evaluation & Proposed REM Preview/Download
BER REPORTS AND PLANS09/19/2006Demo PS MEC Foundation & Soil Removal Preview/Download
BER REPORTS AND PLANS05/16/2006Corrective Measures Report - Final Preview/Download
BER LEGAL-CAD/ROD02/03/2006Corrective Measure Decision Preview/Download
BER REPORTS AND PLANS12/31/2004Addt' Characterization Inv/CM WP - 2/2 Preview/Download
BER REPORTS AND PLANS12/31/2004Addt' Characterization Inv/CM WP - 1/2 Preview/Download
BER REPORTS AND PLANS01/19/2004Sampling & Analysis Work Plan Preview/Download
BER REPORTS AND PLANS10/17/2001Remedial Action Summary Report Preview/Download
BER REPORTS AND PLANS09/01/2000Stockpile Management Plan Draft Final Preview/Download
BER REPORTS AND PLANS06/01/2000Flocculation and Clarification Study Preview/Download
BER REPORTS AND PLANS06/01/2000Stabilization Treatability Study Final Preview/Download
BER REPORTS AND PLANS06/01/2000Treatability Study Field Sampling Plan Preview/Download
BER LEGAL-CAD/ROD04/07/2000Corrective Measure Decision Preview/Download
BER REPORTS AND PLANS02/01/2000Final Documents - CD-ROM Preview/Download
BER REPORTS AND PLANS02/01/2000Treatability Planning and Reporting Docs Preview/Download
BER REPORTS AND PLANS02/01/2000Lead Stabilization WP Final Preview/Download
BER REPORTS AND PLANS02/01/2000Waste Management & Disposal Final Preview/Download
BER REPORTS AND PLANS02/01/2000Stormwater Pollution Prevention Plan Preview/Download
BER REPORTS AND PLANS01/01/2000Sampling & Analysis Plan - Volume 1 of 2 Preview/Download
BER REPORTS AND PLANS01/01/2000Sampling & Analysis Plan - Volume 2 of 2 Preview/Download
BER REPORTS AND PLANS01/01/2000Quality Control Plan/Corr Measures Preview/Download
BER REPORTS AND PLANS01/01/2000Site Safety & Health Plan - Final-1 of 2 Preview/Download
BER REPORTS AND PLANS01/01/2000Site Safety & Health Plan - Final-2 of 2 Preview/Download
BER REPORTS-MONITORING09/01/1999Spill Prevention & Control Plan Preview/Download
BER REPORTS AND PLANS02/01/1999Corrective Measures Study Final Preview/Download
BER REPORTS AND PLANS05/01/1998Corrective Measures Study WP Final Preview/Download
BER REPORTS AND PLANS03/01/1997RFI/QCSR Part 2 Preview/Download
BER REPORTS AND PLANS03/01/1997RFI/QCSR Part 1 - 2 of 2 Preview/Download
BER REPORTS AND PLANS03/01/1997RFI/QCSR Part 1 - 1 of 2 Preview/Download
BER REPORTS AND PLANS02/26/1997Relative Risk Evaluation Worksheet Preview/Download
BER REPORTS AND PLANS07/12/1994Scope of Work - RFI - Final Preview/Download
BER REPORTS AND PLANS11/08/1985Hazardous Waste Study No. 37-26-0709-87 Preview/Download