Identified Site Listing Details

Site Name: Farmland Industries, Inc. - Nitrogen Fertilizer Plant
Project Code: C4-023-00009


Document TypeDocument DateDocument DescriptionPreview/Download Document
BER REPORTS-INSPECTION03/09/2026EUC Inspection Preview/Download
BER REPORTS-MONITORING10/27/2025Performance Evaluation - Sept 2025 Preview/Download
BER REPORTS-INSPECTION03/28/2025I - Lawrence - EUC Inspection Report Preview/Download
BER REPORTS AND PLANS11/13/2024Well Plug & Replacement Preview/Download
BER REPORTS-MONITORING10/28/2024Performance Evaluation Report Preview/Download
BER REPORTS AND PLANS09/05/2024Intrusive Activities Plan Preview/Download
BER REPORTS AND PLANS05/30/2024Plugging & Abandonment Work Plan Preview/Download
BER REPORTS AND PLANS05/10/2024WP for Plugging & Abandoning Mon Wells Preview/Download
BER REPORTS-MONITORING05/08/2024Performance Evaluation March 2024 Preview/Download
BER REPORTS-INSPECTION03/25/2024EUC Inspection - 2024 Preview/Download
BER REPORTS AND PLANS02/08/2024Well PSW-6B4 Replacement WP Preview/Download
BER REPORTS AND PLANS12/21/2023Perf Eval - 11/30/2023 Preview/Download
BER REPORTS AND PLANS09/05/2023RTCs Rem Design/Rem Action Plan Add Preview/Download
BER REPORTS-MONITORING06/22/2023Performance Evaluation Report Preview/Download
BER REPORTS-MONITORING03/24/2023Performance Evaluation Report Preview/Download
BER REPORTS-INSPECTION03/24/2023EUC Inspection Report Preview/Download
BER REPORTS-MONITORING12/22/2022Performance Evaluation Report Preview/Download
BER LEGAL-CAD/ROD10/28/2022Explanation of Significant Differences Preview/Download
BER REPORTS-MONITORING10/24/2022Amended Performance Evaluation Rpt Preview/Download
BER REPORTS-MONITORING06/28/2022Performance Evaluation Report 96 Preview/Download
BER REPORTS-MONITORING06/15/2022Proposed Changes to Remedial Alternative Preview/Download
BER REPORTS-MONITORING03/27/2022Performance Evaluation RPT - Q1- 2022 Preview/Download
BER REPORTS-INSPECTION03/09/2022EUC Inspection Report Preview/Download
BER REPORTS AND PLANS02/11/2022Request to Suspend Monthly GW Mon Act Preview/Download
BER REPORTS-MONITORING02/09/2022Performance Evaluation RPT - Amended Preview/Download
BER REPORTS AND PLANS01/18/2022RTCs on SI Report Preview/Download
BER REPORTS-MONITORING12/28/2021Perfromance Evaluation RPT (PER94) Preview/Download
BER REPORTS-MONITORING11/08/2021Supplemental Investigation RPT Preview/Download
BER REPORTS-MONITORING09/27/2021Performance Evaulation RPT - Q3 -2021 Preview/Download
BER REPORTS-MONITORING08/09/2021Performance Evaluation Report (PER 92) Preview/Download
BER REPORTS AND PLANS04/05/2021Performance Evaluation Report - Q1 -2021 Preview/Download
BER REPORTS-INSPECTION03/19/2021Env Use Control Inspection 11-EUC-0014 Preview/Download
BER REPORTS AND PLANS03/16/2021Mon - Well Installation WP Preview/Download
BER REPORTS-MONITORING11/24/2020PE - Q2 - 2020 Preview/Download
BER REPORTS AND PLANS04/06/2020Cost-Benefit Analysis Report Preview/Download
BER REPORTS AND PLANS03/26/2020Data Gap Study Report Pt 1/2 Preview/Download
BER REPORTS AND PLANS03/01/2020Data Gap Study Report Pt 2/2 Preview/Download
BER REPORTS-INSPECTION02/28/2020Env Use Control Inspection 11-EUC-0014 Preview/Download
BER REPORTS-MONITORING01/14/2020Performance Evaluation Preview/Download
BER REPORTS-MONITORING01/14/2020Performance Eval - 2020 Preview/Download
BER REPORTS-MONITORING10/31/2019Sampling - Oct 2019 Preview/Download
BER REPORTS-MONITORING08/23/2019Mon - July 2019 Preview/Download
BER REPORTS-MONITORING07/19/2019Performance Eval - Q2 - 2019 Preview/Download
BER REPORTS-MONITORING06/07/2019Summary - April 2019 Preview/Download
BER REPORTS-MONITORING03/29/2019Performance Eval - 2019 Preview/Download
BER REPORTS-INSPECTION03/14/2019Env Use Control Inspection 11-EUC-0014 Preview/Download
BER REPORTS AND PLANS03/05/2019MON - RCRA - Ann - 2018 Preview/Download
BER REPORTS AND PLANS01/18/20192018 Data Gap Study WP Revised Preview/Download
BER REPORTS-MONITORING12/28/2018Performance Eval - 2018 Preview/Download
BER REPORTS-MONITORING11/07/2018Monitoring - Monthly - October 2018 Preview/Download
BER REPORTS AND PLANS10/26/2018Request to Extend Interruption Preview/Download
BER REPORTS-MONITORING10/15/2018Sampling - September 2018 Preview/Download
BER REPORTS AND PLANS09/19/2018Performance Evaluation Report Preview/Download
BER REPORTS-MONITORING06/27/2018Performance Eval - Q2 -2018 Preview/Download
BER REPORTS-MONITORING04/12/2018RCRA Care Permit - 20th Semi-Annual - 18 Preview/Download
BER REPORTS-MONITORING04/03/2018Prog & Mon - Monthly March - 2018 Preview/Download
BER REPORTS-MONITORING03/29/2018Monitoring & Management - Annual - 2017 Preview/Download
BER REPORTS-MONITORING03/22/2018Performance Eval - 1st Quarter - 2018 Preview/Download
BER REPORTS AND PLANS02/15/2018Intrusive Activity Notification Preview/Download
BER REPORTS-MONITORING02/09/2018Prog & Mon - Monthly January - 2018 Preview/Download
BER REPORTS-MONITORING01/10/2018Prog & Mon - Monthly December - 2017 Preview/Download
BER REPORTS-MONITORING01/05/2018Performance Eval - 4th Quarter - 2017 Preview/Download
BER REPORTS-MONITORING11/10/2017Prog & Mon - Monthly October - 2017 Preview/Download
BER REPORTS-MONITORING10/18/2017Sampling - Semi-Annual 2 - 2017 Preview/Download
BER REPORTS-MONITORING09/28/2017Performance Eval - 3rd Quarter - 2017 Preview/Download
BER REPORTS-MONITORING08/31/2017Prog & Mon - Monthly August - 2017 Preview/Download
BER REPORTS AND PLANS08/24/2017Temp Interruption of GW Collection Preview/Download
BER REPORTS AND PLANS06/30/2017Request to Shut Off Pump Preview/Download
BER REPORTS-MONITORING06/23/2017Performance Eval - 2nd Quarter - 2017 Preview/Download
BER REPORTS AND PLANS04/10/2017Production Well Plugging & Site Cleanup Preview/Download
BER REPORTS-INSPECTION03/27/2017Env Use Control Inspection 11-EUC-00014 Preview/Download
BER REPORTS-MONITORING09/29/2016Performance Eval - 3rd Quarter - 2016 Preview/Download
BER REPORTS-MONITORING06/21/2016Performance Eval - 2nd Quarter - 2016 Preview/Download
BER REPORTS-MONITORING03/31/2016Performance Eval - 1st Quarter - 2016 Preview/Download
BER REPORTS-MONITORING02/19/2016Sampling Event - 1/19-1/22/2016 Preview/Download
BER REPORTS-MONITORING12/22/2015Performance Eval - 4th Quarter - 2015 Preview/Download
BER REPORTS-MONITORING09/25/2015Performance Eval - 3rd Quarter - 2015 Preview/Download
BER REPORTS-MONITORING06/22/2015Performance Eval - 2nd Quarter - 2015 Preview/Download
BER REPORTS-MONITORING03/20/2015Performance Eval - 1st Quarter - 2015 Preview/Download
BER REPORTS-INSPECTION03/06/2015Env Use Control Inspection 11-EUC-0014 Preview/Download
BER REPORTS-MONITORING12/11/2014Performance Eval - 4th Quarter - 2014 Preview/Download
BER REPORTS AND PLANS12/01/2014Production Well Plugging Report Preview/Download
BER REPORTS-MONITORING09/26/2014Performance Eval - 3rd Quarter - 2014 Preview/Download
BER REPORTS AND PLANS09/23/2014Sampling Event - 9/16/14 Preview/Download
BER REPORTS AND PLANS08/01/2014RCRA-CRS Unit Remediation Work Plan Preview/Download
BER REPORTS AND PLANS08/01/2014Regional Detention Pond Work Plan Preview/Download
BER REPORTS AND PLANS06/25/2014Performance Eval - 2nd Quarter - 2014 Preview/Download
BER REPORTS AND PLANS06/13/2014Remediation Design Pre-Construction Rpt Preview/Download
BER LEGAL-ORDERS04/16/2014First Amendment to Consent Order Preview/Download
BER REPORTS-MONITORING03/25/2014Performance Eval - 1st Quarter - 2014 Preview/Download
BER REPORTS AND PLANS02/07/2014Intrusive Activity Notification Preview/Download
BER REPORTS AND PLANS02/06/2014Groundwater Recovery Work Plan Preview/Download
BER REPORTS-MONITORING12/16/2013Performance Eval - 4th Quarter - 2013 Preview/Download
BER REPORTS AND PLANS12/13/2013RCRA CRS Unit Investigation Work Plan Preview/Download
BER REPORTS AND PLANS12/01/2013Health & Safety Plan Preview/Download
BER REPORTS AND PLANS11/25/2013Remedial Design Pre-Const Work Plan Preview/Download
BER REPORTS AND PLANS11/20/2013Site Specific Quality Assurance Addendum Preview/Download
BER REPORTS AND PLANS10/28/2013NW Dam Pond Sump Work Plan Preview/Download
BER REPORTS-MONITORING09/16/2013Performance Eval - 3rd Quarter - 2013 Preview/Download
BER REPORTS AND PLANS09/16/2013Monitoring - 3rd Quarter - 2013 Preview/Download
BER REPORTS AND PLANS07/16/2013Intrustive Activity Notification Preview/Download
BER REPORTS-MONITORING06/25/2013Performance Eval - 2nd Quarter - 2013 Preview/Download
BER REPORTS AND PLANS06/20/2013Intrusive Activity Notification Preview/Download
BER REPORTS AND PLANS06/12/2013Closure & Cleanup of Sanitary Sewers Preview/Download
BER REPORTS AND PLANS06/05/2013Phase II Sanitary Sewer Abandonment WP Preview/Download
BER REPORTS AND PLANS05/22/2013Intrusive Activity Notification Preview/Download
BER REPORTS AND PLANS03/25/2013Sanitary Sewer Abandonment Work Plan Preview/Download
BER REPORTS-MONITORING03/22/2013Performance Eval - 1st Quarter - 2013 Preview/Download
BER REPORTS AND PLANS02/08/2013Central Pond/Interceptor Trench WP Preview/Download
BER LEGAL-AGREEMENTS02/05/2013Env Use Control Agreement 11-EUC-0014 Preview/Download
BER REPORTS-MONITORING01/01/2013Budget Report - Calendar Year 2013 Preview/Download
BER REPORTS-MONITORING12/11/2012Performance Eval - 4th Quarter - 2012 Preview/Download
BER REPORTS-MONITORING09/21/2012Performance Eval - 3rd Quarter - 2012 Preview/Download
BER REPORTS AND PLANS09/15/2012Final RD/RA Plan Preview/Download
BER REPORTS-MONITORING06/21/2012Performance Eval - 2nd Quarter - 2012 Preview/Download
BER REPORTS-MONITORING03/27/2012Performance Eval - 1st Quarter - 2012 Preview/Download
BER REPORTS-MONITORING12/21/2011Performance Eval - 4th Quarter - 2011 Preview/Download
BER PHOTOS11/01/2011Site Photos Preview/Download
BER REPORTS-MONITORING09/26/2011Performance Eval - 3rd Quarter - 2011 Preview/Download
BER REPORTS-MONITORING06/24/2011Performance Eval - 2nd Quarter - 2011 Preview/Download
BER REPORTS AND PLANS06/24/2011City of Lawrence Transition Plan Preview/Download
BER REPORTS-MONITORING03/25/2011Performance Eval - 1st Quarter - 2011 Preview/Download
BER REPORTS-MONITORING12/22/2010I-City Lawrence - Perf Eval Rpt Preview/Download
BER LEGAL-AGREEMENTS09/24/2010KDHE & Lawrence Escrow Agreement Preview/Download
BER REPORTS AND PLANS09/22/2010I-Shaw - Per & Eval Rpt Preview/Download
BER LEGAL-ORDERS06/28/2010Consent Order 10-E-94 Preview/Download
BER LEGAL-ORDERS06/28/2010Consent Order Preview/Download
BER REPORTS-MONITORING06/25/2010I-Shaw - Performance Eval Rpt Preview/Download
BER LEGAL-ORDERS06/21/2010Consent Order Preview/Download
BER REPORTS-MONITORING03/26/2010Performance Eval - 1st Quarter - 2010 Preview/Download
BER LEGAL-CAD/ROD02/01/2010Corrective Action Decision Preview/Download
BER REPORTS-MONITORING09/29/2009RCRA Well Monitoring Preview/Download
BER REPORTS-MONITORING08/27/2009Class V IW Report Preview/Download
BER REPORTS-MONITORING06/17/2009Performance Eval - 2nd Quarter - 2009 Preview/Download
BER REPORTS-MONITORING06/16/2009Class V IW Report Preview/Download
BER REPORTS-MONITORING05/26/2009I-SELS - Qrterly Progress Rpt Preview/Download
BER REPORTS AND PLANS05/22/2009Remedial Action Plan Part I Preview/Download
BER REPORTS AND PLANS05/22/2009Remedial Action Plan Part III Preview/Download
BER REPORTS AND PLANS05/22/2009Remedial Action Plan Part II Preview/Download
BER REPORTS-MONITORING03/31/2009I-Shaw - 2008 Annual RPT Preview/Download
BER REPORTS-MONITORING03/24/2009Performance Eval - 1st Quarter - 2009 Preview/Download
BER REPORTS AND PLANS12/31/2008I-Shaw - Report on Major Subsurface Pipe Preview/Download
BER REPORTS-MONITORING12/29/2008Performance Eval - 4th Quarter - 2008 Preview/Download
BER REPORTS AND PLANS10/27/2008Data Gap Sampling Preview/Download
BER REPORTS-MONITORING10/02/2008Data Gap Samp Field/Lab RPT Preview/Download
BER REPORTS AND PLANS10/01/2008Geophysical Survey Report Preview/Download
BER REPORTS AND PLANS09/29/2008HSP Preview/Download
BER REPORTS-MONITORING09/29/2008Performance Eval - 3rd Quarter - 2008 Preview/Download
BER REPORTS AND PLANS09/01/2008Farmland Data Gap Sampling WP Preview/Download
BER REPORTS-MONITORING08/29/2008RCRA Post Closure Care Preview/Download
BER REPORTS-MONITORING06/28/2008Performance Eval - 2nd Quarter - 2008 Preview/Download
BER REPORTS-MONITORING05/13/2008Monthly Report for Class V Injection Pmt Preview/Download
BER REPORTS-MONITORING05/13/2008April 2008 Monthly UIC Report Preview/Download
BER REPORTS-MONITORING03/28/2008Performance Eval - 1st Quarter - 2008 Preview/Download
BER REPORTS-MONITORING01/29/2008RCRA Post Closure Care Preview/Download
BER REPORTS-MONITORING12/28/2007Performance Eval - 4th Quarter - 2007 Preview/Download
BER REPORTS AND PLANS11/07/2007I-WP Supp Data Collection Preview/Download
BER REPORTS AND PLANS10/26/2007Project Information Preview/Download
BER REPORTS AND PLANS10/25/2007Supplemental Soil Investigation Preview/Download
BER REPORTS-MONITORING09/28/2007Performance Eval - 3rd Quarter - 2007 Preview/Download
BER REPORTS AND PLANS08/17/2007Soil Inv WP Preview/Download
BER REPORTS-MONITORING08/14/2007I-Shaw - Treatability Testing RPT Preview/Download
BER REPORTS AND PLANS07/20/2007Preliminary Data Evaluation Preview/Download
BER REPORTS-MONITORING06/27/2007Performance Eval - 2nd Quarter - 2007 Preview/Download
BER REPORTS AND PLANS05/11/2007Monitoring Well Abandonment Preview/Download
BER REPORTS AND PLANS05/01/2007Area A Drainage Modifications Preview/Download
BER REPORTS-MONITORING03/30/2007Performance Eval - 1st Quarter - 2007 Preview/Download
BER REPORTS-MONITORING12/29/2006Performance Eval - 4th Quarter - 2006 Preview/Download
BER REPORTS-MONITORING09/29/2006Performance Eval - 3rd Quarter - 2006 Preview/Download
BER REPORTS AND PLANS09/27/2006Monitoring Well Evaluation & Recommend Preview/Download
BER REPORTS-MONITORING06/29/2006Performance Eval - 2nd Quarter - 2006 Preview/Download
BER REPORTS AND PLANS05/09/2006Site Char Supp GW Inv Preview/Download
BER REPORTS-MONITORING03/31/2006Performance Eval - 1st Quarter - 2006 Preview/Download
BER REPORTS-MONITORING02/28/2006RCRA CA Annl GW MON Preview/Download
BER REPORTS AND PLANS02/01/2006Site Characterization Report - Part 1/3 Preview/Download
BER REPORTS AND PLANS02/01/2006Site Characterization Report - Part 2/3 Preview/Download
BER REPORTS AND PLANS02/01/2006Site Characterization Report - Part 3/3 Preview/Download
BER REPORTS-MONITORING01/20/2006RCRA Well Monitoring Preview/Download
BER REPORTS-MONITORING12/29/2005Performance Eval - 4th Quarter - 2005 Preview/Download
BER REPORTS-MONITORING09/29/2005Performance Eval - 3rd Quarter - 2005 Preview/Download
BER REPORTS-MONITORING06/29/2005Performance Eval - 2nd Quarter - 2005 Preview/Download
BER REPORTS-MONITORING03/29/2005Performance Eval - 1st Quarter - 2005 Preview/Download
BER REPORTS AND PLANS01/07/2005Site Characterization Work Plan Preview/Download
BER REPORTS-MONITORING12/22/2004Performance Eval - 4th Quarter - 2004 Preview/Download
BER REPORTS AND PLANS11/08/2004Strategy Document Preview/Download
BER REPORTS-MONITORING09/29/2004Performance Eval - 3rd Quarter - 2004 Preview/Download
BER REPORTS-MONITORING03/22/2004Performance Eval - 1st Quarter - 2004 Preview/Download
BER REPORTS-MONITORING12/22/2003Performance Eval - 4th Quarter - 2003 Preview/Download
BER REPORTS-MONITORING09/24/2003Performance Eval - 3rd Quarter - 2003 Preview/Download
BER REPORTS-MONITORING06/20/2003Performance Eval - 2nd Quarter - 2003 Preview/Download
BER REPORTS-MONITORING03/20/2003Performance Eval - 1st Quarter - 2003 Preview/Download
BER REPORTS-MONITORING12/20/2002Performance Eval - 4th Quarter - 2002 Preview/Download
BER REPORTS-MONITORING09/26/2002Performance Eval - 3rd Quarter - 2002 Preview/Download
BER REPORTS-MONITORING06/24/2002Performance Eval - 2nd Quarter - 2002 Preview/Download
BER REPORTS-MONITORING03/25/2002Performance Eval - 1st Quarter - 2002 Preview/Download
BER REPORTS-MONITORING12/21/2001Performance Eval - 4th Quarter - 2001 Preview/Download
BER REPORTS-MONITORING09/28/2001Performance Eval - 3rd Quarter - 2001 Preview/Download
BER REPORTS-MONITORING06/29/2001Performance Eval - 2nd Quarter - 2001 Preview/Download
BER REPORTS-MONITORING12/29/2000Performance Eval - 4th Quarter - 2000 Preview/Download
BER REPORTS-MONITORING06/30/2000Performance Eval - 2nd Quarter - 2000 Preview/Download
BER REPORTS-MONITORING03/31/2000Performance Eval - 1st Quarter - 2000 Preview/Download
BER REPORTS-MONITORING12/30/1999Performance Eval - 4th Quarter - 1999 Preview/Download
BER REPORTS-MONITORING09/30/1999Performance Eval - 3rd Quarter - 1999 Preview/Download
BER REPORTS-MONITORING06/30/1999Performance Eval - 2nd Quarter - 1999 Preview/Download
BER REPORTS-MONITORING03/30/1999Performance Eval - 1st Quarter - 1999 Preview/Download
BER REPORTS-MONITORING12/30/1998Performance Eval - 4th Quarter - 1998 Preview/Download
BER REPORTS-MONITORING09/30/1998Performance Eval - 3rd Quarter - 1998 Preview/Download
BER REPORTS-MONITORING06/30/1998Performance Eval - 2nd Quarter - 1998 Preview/Download
BER REPORTS-MONITORING03/31/1998Performance Eval - 1st Quarter - 1998 Preview/Download
BER REPORTS AND PLANS12/18/1997Corrective Action Plan Preview/Download
BER REPORTS AND PLANS05/07/1997RCRA CA EI Preview/Download
BER LEGAL-CAD/ROD12/18/1995Corrective Action Decision Preview/Download
BER REPORTS AND PLANS03/03/1995Corrective Action Study Preview/Download
BER REPORTS AND PLANS08/15/1994Comprehensive Investigation Supplemental Preview/Download
BER REPORTS-MONITORING08/03/1994Progress - 2nd Quarter - 1994 Preview/Download
BER REPORTS AND PLANS01/07/1994Revised CI - vol 1 and 2 Preview/Download
BER REPORTS-MONITORING10/29/1993Progress - 3rd Quarter - 1993 Preview/Download
BER REPORTS-MONITORING08/04/1993Progress - 2nd Quarter - 1993 Preview/Download
BER LEGAL-ORDERS01/27/1993Consent Order Preview/Download
BER REPORTS AND PLANS01/04/1993Comp Investigation/Corr Action Study Preview/Download
BER REPORTS AND PLANS01/28/1992I-Farmland - Final RFA Preview/Download
BER REPORTS AND PLANS09/26/1990RCRA Facillity Assessment FINAL Report Preview/Download
BER REPORTS AND PLANS09/01/1986RCRA GW Comprehensive Moniitoring Eval Preview/Download
BER REPORTS-MONITORING03/14/1986Accelerated GW Clean-up Structure Preview/Download
BER REPORTS-MONITORING03/03/1986Well Boring & Monitoring Preview/Download
BER REPORTS-MONITORING02/28/1986Monitoring - Annual - 1985 Preview/Download
BER REPORTS-MONITORING11/15/1985Revised Alt GW Mon Plan Preview/Download
BER REPORTS AND PLANS07/23/1985Alternative Groundwater Monitoring Plan Preview/Download
BER REPORTS AND PLANS12/13/1974Soil Investigation Preview/Download
BER LEGAL-CAD/ROD12/18/1995 rpt dateFinal CAD Preview/Download
BER REPORTS AND PLANS Water Mgmt WP Preview/Download
BER REPORTS-MONITORING2004RCRA CA Annual GW Mon Preview/Download
BER REPORTS AND PLANS Land Application Plan Preview/Download
BER REPORTS-MONITORING Remediation Trust - 2005 Annual Report Preview/Download
BER REPORTS AND PLANS WP for Cln Clos Wtr Inj Preview/Download
BER REPORTS AND PLANS Interim Measures WP Preview/Download
BER REPORTS AND PLANS Supp GW Char Preview/Download
BER REPORTS AND PLANS I- Interim Measures Activities Preview/Download
BER REPORTS AND PLANS06012007Drainage Study Preview/Download
BER REPORTS AND PLANS03212007Status Report Preview/Download
BER REPORTS-MONITORING Comprehensive GW Monitoring Eval Preview/Download
BER REPORTS-MONITORING Monitoring - Semi-Annual 1 - 1998 Preview/Download
BER REPORTS-MONITORING2006UIC Preview/Download
BER REPORTS-MONITORING2009UIC Preview/Download
BER REPORTS-MONITORING2007UIC Preview/Download
BER REPORTS-MONITORING Progress - 1st Quarter - 2013 Preview/Download
BER REPORTS-MONITORING Progress - 2nd Quarter - 2013 Preview/Download
BER REPORTS-MONITORING Budget Reports - 2010 - 2011 - 2012 Preview/Download
BER REPORTS-MONITORING Progress - 4th Quarter - 2013 Preview/Download